I-35 traffic to divert to SH-15 ramps Friday, Saturday nights for bridge work

Team Radio Marketing Group - March 14, 2017 4:47 pm

The following closures will take place this week for ongoing bridge reconstruction at I-35 and SH-15 (mm 203) north of Perry in Noble County:

  • I-35 traffic will be diverted to the on- and off-ramps at SH-15 (mm 203) from 8 p.m. Friday to 10 a.m. Saturday and additionally from 6 p.m. Saturday to 11 a.m. Sunday.
  • SH-15 will not have access to I-35 from 8 p.m. Friday to 10 a.m. Saturday and from 6 p.m. Saturday to 11 a.m. Sunday.
  • I-35 remains narrowed to one lane in each direction at SH-15.
  • The SH-15 bridge over I-35 is closed through summer 2017.
  • SH-15 traffic remains detoured to SH-74, US-412, US-77 and US-60.

The speed limit is reduced in this area and motorists are advised to plan for delays.

The $8.8 million bridge project started in early January and is expected to complete by late summer 2017. Two additional I-35 bridges will be reconstructed at Fountain Road and Bender Road in Noble and Kay counties as part of the contract with OBC Inc. of Edmond.

 

Latest Stories

Wrestler Kyle Snyder looks to become fourth American to win two Olympic gold medals

By CLIFF BRUNT AP Sports Writer (AP) — Kyle Snyder already has one of the best...

Judge’s order expands where Biden can’t enforce a new rule protecting LGBTQ+ students

By JOHN HANNA Associated Press TOPEKA, Kan. (AP) — Enforcement of a federal rule expanding anti-discrimination...

Biden heads into a make-or-break stretch for his imperiled presidential campaign

WASHINGTON (AP) — President Joe Biden on Thursday opened a critical stretch in his effort to salvage his imperiled reelection campaign, facing...